Decommissioning offshore oil and gas installations is an inevitable phase of the asset lifecycle—carrying multi-billion-dollar liabilities with no commercial return. Navigating regulatory complexities, cost estimation, well abandonment, and heavy-lift removal requires structured planning and disciplined execution to mitigate risks and control overall expenditure.
SEMARAK Training’s Decommissioning of Offshore Installations programme equips industry professionals with a comprehensive understanding of the entire decommissioning process—from late-life operations through to planning, preparation, execution, and final closeout.
Understanding Offshore Decommissioning Challenges
Effective decommissioning begins years before Cessation of Production (COP). Operators and contractors must balance strict international and national regulations, stakeholder expectations, comparative assessments, and HSE risks while selecting the most viable technical and commercial pathways.
Structured around a practical, step-by-step lifecycle journey starting roughly eight years prior to COP, participants work through real-world case studies and team exercises—developing a complete decommissioning strategy, schedule, and cost estimate for a typical offshore field.
Core Curriculum: From Late Life to Closeout
Over three days, the programme covers the full scope of offshore decommissioning:
- Strategy & Regulations: Global and regional legislation (including Malaysia, the UK, Brazil, and West Africa), reuse/artificial reef options, contracting strategies, and stakeholder management.
- Planning & Estimating: Work Breakdown Structures (WBS), scheduling, operator sanction processes, cost estimating, and comparative assessments.
- Preparatory Work & Well Abandonment: Transitioning from production, engineering down, hydrocarbon freeing, waste management, HSE safety cases, and well abandonment.
- Removal, Subsea & Closeout: Topsides and jacket removal methods (single lift, piece-small, reverse installation), subsea pipelines and FPSO decommissioning, onshore disposal, and ongoing liability closeout.
Who Should Attend?
This programme is essential for professionals involved in offshore decommissioning who need to manage obligations, mitigate liabilities, and reduce overall project costs.
Secure Your Place
- Course: Decommissioning of Offshore Installations
- Date: 2-4 February 2027 (3 Days)
- Location: Kuala Lumpur
- Early Bird Offer: Grab RM500 off when you register by 4 December 2026 (Team rates also available).
This programme is HRD Corp claimable and delivered by a PETRONAS licensed company and HRD Corp registered training provider.
Decommissioning liabilities require proactive strategy and technical precision. Gain the practical insight needed to plan, execute, and close out offshore decommissioning projects safely and cost-effectively.
Download the course brochure for the full programme, fees and registration details: